Chapter 1 Introduction
1.1 Research Background
The scale of maintenance operations in the sectors of manufacturing, energy, transportation, and facility management that are high in equipment and service has increased greatly in the last few decades. Large enterprises usually have thousands to tens of thousands of pieces of equipment in different places, and large amounts of repair requests are handled daily by the maintenance department or outsourced service providers. Therefore, the speed of maintenance response will affect the company's productivity, availability of assets, and service quality.
With the popularization of digitalised dispatch platforms, the way work orders are managed has changed significantly. The previous ways of repair requests were telephone or paper; now, there are integrated systems that can automatically generate, sort, route, and track them. Although it is easy to see what is happening, now there are more work orders because the threshold for submitting reports has been lowered and people are more demanding of service. In this case, the ability of the maintenance organisation to respond in time is being tested more and more, and the problem of response timeout is a persistent operational issue that means the maintenance organisation is unable to start or complete a repair request within the time limit set by the service-level agreement (SLA) or internal regulation.
The impact of the timeout is many aspects. From the customer's point of view, a slow response can cause dissatisfaction and a loss of trust, so they may no longer be interested in the service. According to the contract, SLAs in industrial maintenance service agreements usually specify graded response time standards; if breached, there will be financial penalties or service credits, and thus accumulated timeout incidents will result in direct financial loss. Prolonged waiting for maintenance response will increase the downtime of equipment due to asset management, interrupt production schedules, and may even turn minor faults into serious accidents, thereby increasing the cost of repairs and safety risks. It has been shown through research in reliability engineering that early intervention in the failure process can reduce the total cost of life-cycle maintenance, so timely response is of economic importance.
The Academic and industrial research on Work Order Management has taken some new directions. Internationally, there is a lot of research in queueing theory and operations management that has been applied to the modelling of maintenance service systems to study waiting time distribution and resource allocation; later studies have used optimisation algorithms, simulation and machine learning for decision-making on dispatching and scheduling of technicians. Domestic research has also explored the issues of the digitalised maintenance platform, SLA design and performance evaluation index, and the relevant industry rules and group standards have been adopted to provide a reference framework for graded response time requirements at various fault levels. So far, some achievements have been made in improving the service response.
There are still some problems. The first is that the current research has mostly focused on the end result of timeout and has not paid enough attention to identifying the reasons for it; thus, some problems may be present, such as a large number of work orders that have been incorrectly classified, unreasonable routing rules, uneven work distribution among technicians and an imbalance in the number of staff for work that is busy or has few personnel. Without a structured causal identification framework, the improvement measures are often fragmented and based on experience. Second, the literature only offers a few options for how to improve quantitatively: the suggestions put forward are rarely broken down into concrete goals, step-by-step implementation plans or specific indicators that can be used to monitor whether reasons for delay are addressed and the timeout rate reduced. Third, there has not been much empirical verification of real enterprise work order data to date, especially for the entire life cycle from request submission to response closure.
Therefore, in order to address this problem, there is a need to research how to reduce the time taken for repair requests to be responded to in work order. Through a systematic diagnosis of timeout reasons and the construction of a quantitative and stage-by-stage improvement path, maintenance organisations can meet the required time limit of the contract, reduce downtime losses and improve customer satisfaction; at the same time, it will also enrich the methodological toolbox for service operations management research. This paper will be based on the reasons for the timeout of the response and propose some practical ways to improve it according to the actual work order data.
1.2 Research Objectives and Significance
The research goals are divided into three layers and will be analysed in sequence to form a logic chain. The first layer will build an index system of influencing factors for work order response timeout. Response timeout refers to the period from the time when a work order is received to when the first actual response is given according to the Service Level Agreement or internal dispatching regulations, and it is not caused by a single reason. It is a combination of multiple reasons, including personnel, process, technology and task attributes. Therefore, this paper will systematically collect candidate factors by literature review, Industry Dispatching Regulations and semi-structured interviews with frontline dispatchers and service personnel, and then classify them into an index system based on dimensions. In the process of refinement, some candidate factors that have the same or similar semantics or cannot be measured will be removed or merged, and thus the final system will be concise but comprehensive. The above is the general framework for all the following analyses; that is to say, factor selection should be complete within a certain range, mutually exclusive among dimensions and be able to be used for analysis at the operation level.
The second layer will construct a fuzzy DEMATEL diagnosis model to obtain the key influencing factors. The Decision-Making Trial and Evaluation Laboratory method (Decision-Making Trial and Evaluation Laboratory) can show the directed causality among factors, and its fuzzy extension can deal with the vague language of experts' evaluations. Based on the above, a domain expert will evaluate the degree of mutual influence between two factors using fuzzy linguistic variables and then convert the two factors into a direct-influence matrix after defuzzification; the model will be used to calculate a total-relation matrix and then derive the centrality and cause-effect degree of each factor. The overall weight of a factor in the system is determined by its centrality; however, causality distinguishes between factors that are causes of system behaviour and those that are affected. After this, we can build a causal diagram based on the descriptive index system to determine which factors are the root causes of the time-out and avoid simply discussing the symptoms of the time-out.
The third layer is to design and verify the optimization path. Guided by the results of diagnosis, this paper will formulate targeted countermeasures according to the reasons found in the diagnosis. First, we will adjust the rules for scheduling, dynamically assign staff, and optimize the response process. It will then assess whether it is feasible and what kind of effect it might have based on the opinion of experts and, if data permit, conduct a comparative analysis of the indicators before and after intervention of time-outs. The first choice for countermeasures is to take a cost-benefit approach; thus, the limited management resources will be employed to boost timeliness. The above goal architecture consists of constructing an index system, conducting causal diagnosis, and developing an optimisation plan; therefore, a logical connection exists between the problem and the solution.
There are two reasons for this research. The existing research on work order management in our country mostly focuses on descriptive statistics of timeliness or post-event performance evaluation, and there is no in-depth study of the reasons for the delay in work orders. Based on this, the fuzzy DEMATEL method will be employed in the research of work order responses; therefore, this paper can enrich the theory of work order response management and show the application of causal modelling in service operations, providing a repeatable analysis model for the diagnosis of complex, interconnected operational problems.
In practice, the research provides enterprises with specific methods rather than suggestions. The factor index system is used to help the service management staff conduct self-inspection; thus, it can determine the particular lever that requires intervention in the most effective way. To address this, adjust the order of distribution, modify the number of staff based on the number of orders, etc., reduce the waiting time. As a result, the timeout rate will decrease, customer satisfaction will rise, and non-compliance risk arising from breach of service commitments will be reduced.
The thesis is divided into six chapters in an uninterrupted order. First, introduce the research background, questions, and purposes; then review relevant theories and determine the research gap; build the index system in the methodology chapter and explain the fuzzy DEMATEL model; apply the model to actual work order data in the empirical chapter to find the main influencing factors; and finally develop and check the optimization path. Finally, the chapter will summarise the results of this thesis, point out its shortcomings and propose future research directions. The first chapter will provide background information for later study.
表1 Research Objectives and Corresponding Significance
Chapter 2 Theoretical Foundation and Current Status Analysis of Repair Request Work Order Response Timeout
2.1 Core Concepts and Theoretical Basis of Repair Request Work Order Response Management
The work order for repair is the basic unit of operation in the facility maintenance service system, and it is a formal digital record that contains all relevant information such as the problem description, the time it was submitted, where it happened or which equipment is involved, and the complete audit trail of subsequent action processing. The response time is closely linked to this idea; in this paper, it is taken as the time taken from when a work order is officially recorded in the system by maintenance personnel to when maintenance personnel officially accept the order and carry out the service, i.e., the time taken to receive an order. The response timeout is the time when the elapsed time is longer than the limit specified by the service-level agreement, and the timeout rate is the proportion of timed-out work orders to all closed work orders in the same statistics; it can be regarded as a first measure of how well a service has responded.
The theoretical basis of work order response management is rooted in service operations management and therefore can be seen as a problem of demand-capacity matching with random arrivals, different service requirements, and limited technician resources. According to Service Operations Theory, the degree of responsiveness is an essential element in the quality of services; delays in the early stages of the life cycle will lead to cumulative deterioration in later stages, and this phenomenon also occurs in the serial dependency of work order life cycles. In light of this, Queuing Theory has been developed to study the causes of congestion at the time of disbursement. According to the M/M/c queuing model, work order arrivals can be modelled as a Poisson process, technician availability is treated as parallel service channels, and the queueing delay before acceptance is a function of the utilisation rate of service capacity. When the arrival rate divided by the total service capacity is close to one, the expected waiting time will grow in a nonlinear way; thus, it can be seen that small increases in the number of requests will lead to relatively large increases in the response time. The above theory mainly aims at improving the distribution of capacity, balancing the workload, and smoothing demand; it does not consider the performance of individual workers.
Business process reengineering has provided a way to analyse processes; it is believed that in order to improve performance systematically, the end-to-end workflow needs to be completely redesigned rather than just adjusting one by one. For work order management, we need to look at the intake, dispatch, acceptance, and on-site response processes in a connected way, find out the reasons for information asymmetry, redundant approval layers, or unclear responsibility assignment and other reasons for waiting time in handover points, and then restructure the process to reduce non-value-added delay. Total quality management has provided the concept of continuous improvement and management; it is believed that quality can only be realised by all employees in the organisation, with the support of data, in an organised manner according to the plan-do-check-act cycle. Within this paradigm, timeout rate monitoring is not simply about compliance but also a way of providing feedback. The root cause analysis of timed-out orders will be introduced into the process standard and then institutionalised through iterative optimisation.
Based on all these, the analysis of the work order life cycle will be divided into four parts. At this time, some information needs to be filled in; otherwise, there may be problems in the next step. The dispatch stage is to allocate the orders to technicians based on skill-matching, close-to-site and workload status, and the timing of the queue determines how likely it is that orders will be delayed here. At the time of acceptance, the people in charge will be notified of the order and be required to provide a service timeline; this period will be counted as the formal boundary of response time measurement in the present study. In the on-site response stage, the technician will perform the repair, and the time it takes is in the category of resolution performance rather than response performance; thus, it is not included in the direct scope of the timeout criterion.
With respect to the boundary conditions and applicable standards, in this paper, the timeout judgment criterion is that the interval between the system time of a work order and the formal time of acceptance is longer than the threshold specified in the internal service regulations of the institution; different thresholds are set for different priority levels, generally 30 minutes for emergency priority, four hours for standard priority, and 24 hours for routine priority. Work orders suspended by the requester, cancelled before dispatch, or due to declared force majeure are not included in the statistical scope of timeout. The operating definition is measurable and fair for accountability and is in line with the logic of the service-level agreement for maintenance service outsourcing; it provides a solid foundation for subsequent analysis and improvement.
表2 Comparison of Queueing Models for Work Order Response
2.2 Current Status and Core Causes of Repair Request Work Order Response Timeout
To study the repair request work order response timeout, we need to clarify its definition first. "Timeout" is not absolute; rather, it depends on how long the system is required to respond, and so on. This paper defines the response timeout as the time from when the work order is submitted (the system records the time of the user's request) to the first response (dispatch confirmation or arrival of a technician according to the service level agreement). High-priority orders need to be responded to within 30 minutes of the first call, and medium-priority orders can be responded to in 120 minutes. The double Anchor Definition does not involve the downstream repair time at all; thus, the responsiveness of the dispatch and allocation system is examined separately. Based on this definition, the case enterprise's historical work order data for the last 18 months have been collected, cleaned, and statistically analysed to determine the current situation of time-out occurrences and their reasons. Exclude the missing time-stamp records and duplicate submissions, approximately 2.7% of the total, before the analysis to maintain the accuracy of the measurements.
The descriptive statistics have shown that there are still timeouts in some areas of the enterprise. In general, the overall timeout rate of all monitoring systems was 14.6% over the course of observation, but it was relatively high at 11.2% to 19.8% in recent months; thus, the reason for the increase in recent quarters is not random but structural. Disaggregation by dimension shows that the problems are not uniform. According to equipment type, HVAC systems and production-line conveying equipment have the highest timeout rates at 27.3% and 22.1% respectively, which are much higher than the average of the entire company; therefore, such devices need special diagnostic abilities and few spare parts. The night shift (22:00 to 06:00) has a higher timeout rate of 23.5% than the day shift (12.1%), and the staff at night are relatively few. The timeout rate of the distributed subsidiary site is about 1.6 times that of the headquarters campus due to the long distance and uneven distribution of technicians. According to the priority level, there is an unreasonable trend that the timeout rate of medium-priority orders (16.8%) is higher than that of high-priority orders (9.4%), indicating that priority-based queueing rules are not actually improving the overall response time but are crowding out medium-priority orders. Based on these breakdowns, it can be seen that the risk of timeout is concentrated in some parts that can be identified; thus, a targeted solution will be taken to address it, not all employees at once.
The root cause analysis was carried out by constructing a structured process walkthrough of the entire work order life cycle (submission, intelligent dispatch, manual reassignment, technician travel, on-site diagnosis and closure) to determine how to address the problem of descriptive diagnosis. Triangulating the observational and interview data, the causes can be divided into five aspects. First, there is a lack of sufficient maintenance staff for the number of work orders; hence, during peak hours and at night, technicians have far too many orders, and the skill structure is uneven; generalist technicians cannot repair the specific problems of HVAC or PLC, so they will be escalated and queued. Second, there are problems with the rules of the dispatcher; the current dispatching mode is based mainly on manual assignment according to the experience of the dispatcher and lacks dynamic matching of the technicians' location, skill certificates and current work load; moreover, the priority queue rule has no starvation-prevention mechanism, and thus, the medium-priority order has a relatively high timeout rate. Thirdly, the information system has problems in responding; the work order management platform is slow to push notifications (with a delay of about 7 to 12 minutes at peak load), does not automatically escalate for old orders, and has poor mobile terminal functions; consequently, the measured response time is raised due to reasons unrelated to the technician. Fourth, the number of spare parts is not sufficient; according to the inventory record, the stockout rate of the key spare parts for high-timeout equipment types is 18%, and the requisition-approval time for those items is about 2.3 days, resulting in a shortage of materials for the orders. Fifth, Assessment Incentive: Currently, the performance appraisal system assigns more weight to "closure timeliness" than "first-response timeliness," so the incentives for a quick Dispatch Acceptance award are not strong; at the same time, there is no difference in compensation for night shift and remote-site service, which reduces the willingness to take up off-hour duties.
Based on the above, the main reason structure is that all parts are interconnected instead of being a list of independent problems. Inadequate personnel-skill matching is the capacity constraint; Experience-based dispatch and irrational priority rules lead to distribution inefficiencies; The delay in system response and misaligned assessment are institutional amplifiers; Spare parts shortage is a material problem. There is feedback coupling among these five; for example, dispatch inefficiency will raise the queue length, which under the fixed capacity will increase the time-out phenomenon, thereby increasing the pressure on the assessment indicators and discouraging technicians from participating, and thus reducing the speed of accepting the dispatch. The above reason structure can be used to build the test analysis framework of Chapter 3's optimization model; in this model, dispatching rules and personnel allocation are the main decision variables, and the information system and incentive mechanisms are the support constraints.
2.3 Methodology of This Study
The research in this paper adopts the sequential and multi-stage mode of qualitative summary, quantitative examination and empirical testing. The logic of the whole process is a closed-loop: find the problem according to literature and case evidence; then select the contributing factors based on expert evaluation; use fuzzy DEMATEL to diagnose the causal structure of the factors; and use a before-and-after comparison to verify the effect of the proposed improvement strategies. At each stage, there is a corresponding research question, and the combination of research methods will provide theoretical support and practical operation basis for the results.
In the first stage, literature analysis is combined with case studies. Literature analysis is used to systematically sort out the domestic and foreign research of work order management, response-time performance evaluation and service quality improvement in facility maintenance, thus obtaining the theoretical definition of response timeout and building an initial factor pool that covers staff, process, resources, etc. The case study part is based on the historical work order records, dispatch logs and escalation reports of the study organisation, and the researcher can follow the actual timeout incidents from beginning to end. The triangulation of documentary and archival evidence may correct the bias of a single theoretical deduction and make the first factor pool more in line with the actual situation of operation. The first research question, "What causes response timeout?", is based on the fact that timeout is a situation-related problem that has both theoretical support and specific circumstances.
Stage two will use an expert questionnaire to screen for factors. Based on the preliminary factor pool, there might be some items that are not needed or have low impact, so the experts will be asked to choose only the more important factors for further causal analysis. The expert group will be composed of 10 to 15 experienced employees from the front line, such as dispatchers, maintenance engineers, and middle managers. This purposive sampling is reasonable for two reasons: dispatchers can notice all aspects of the life cycle of work orders and know where information flow has problems, maintenance engineers can feel the constraints of resources and problems with technology, and managers can be aware of the conditions of the system and evaluation. Including all three types of views can avoid the single-person bias that often affects judgmental research. The screened factors are presented in the questionnaire, and experts will evaluate their perceived influence using a fuzzy linguistic scale; then, the values will be converted to triangular fuzzy numbers. In order to ensure reliability, the questionnaire is tested with two to three experts for comprehensibility, and the consistency among the experts is investigated; if there is a significant difference in opinion among the experts, the definition of an uncertain factor is revised, and the questionnaire is distributed again. The sample depends on the availability and willingness of experts, rather than on random selection; this is typical in small-panel multi-criteria decision-making studies. The small panel has been subject to rules on professional homogeneity and a minimum number of years of experience.
The third stage uses fuzzy DEMATEL (Decision-Making Trial and Evaluation Laboratory integrated with fuzzy set theory) for causal diagnosis. The first kind of DEMATEL is based on the concept of a crisp pairwise influence scale; it cannot well capture the imprecise nature of the experts' thinking. Fuzzy DEMATEL can express the opinions of experts in the form of fuzzy numbers, and thus better address the problem of uncertainty in cognition. The calculation steps are as follows: first, create a fuzzy direct-influence matrix by comparing the factors with each other; second, normalise and defuzzify the matrix; third, calculate the total-influence matrix through matrix operations and determine the prominence value and relation value for each factor according to the criteria of the total-influence matrix convergence. Factors with positive relation values are the net reasons for the development of the system, and those with negative relation values are the net results. It can be calculated in MATLAB or Python; these tools can do some matrix operations on fuzzy numbers, generate repeatable scripts, and make sensitivity checks by changing the defuzzification parameters. This way is to answer the second research question: how does the causal structure among the factors lead to response timeout? The reason for the delay in the response is often not due to a single factor but is caused by problems upstream in the system due to the rules of the dispatch system and staffing; these problems will eventually be reflected in the response time. Therefore, the directed graph of DEMATEL can help us prioritise the causes of the problem and focus our efforts there.
In the fourth stage, a before-and-after empirical comparison will be carried out to check whether the proposed path of optimisation works. Based on the causal analysis, the study organisation has taken appropriate measures; generally, adjustments to the dispatch rules, staffing arrangements and assessment mechanisms, etc., will be made, and then the work order response data will be examined for comparison before and after these changes during a certain time period. The main indicators are average response time, timeout rate and the distribution of response durations. In order to reduce the effect of seasonal changes in work volume, a relatively stable time period is selected. This is to answer the third research question, that is, whether the path of optimisation is effective, and to add some real-life behaviour data to support the perceptual data of the experts, thus enhancing the internal validity.
For data sources, three ways are used: archival work order records that provide objective performance data, questionnaire responses that provide organised expert opinions, and interview notes and case documents that provide contextual interpretations. The analysis software uses MATLAB or Python scripts to calculate the fuzzy matrix and standard statistical tools to compare and test the reliability. The reason for the above construction is that different question types can be answered by different methods; that is to say, description questions are answered by literature and case studies, cause-structure questions by Fuzzy DEMATEL, and evaluation questions by empirical comparison. The staged design also has built-in verification points, and if there are errors in factor screening during the diagnosis stage or errors in diagnosis during the verification stage, then the robustness and reliability of the final conclusions will be enhanced.
Chapter 3 Diagnosis Model Construction and Key Factor Identification for Repair Request Work Order Response Timeout
3.1 Response Timeout Influencing Factor Index System Construction
To establish a scientific index system of the influencing factors for diagnosing the problems of the response timeout of repair request work orders is the first step. An index system is a collection of several observable and quantifiable variables organised hierarchically to represent a complex phenomenon that cannot be described by a single index. The reason for the timeout in work order management is not one reason alone but a combination of many reasons, such as staffing conditions, procedures, technical support systems, etc. Therefore, the index system must have three standards of method: comprehensiveness (to cover all necessary information), measurability (to assign a number to each item according to certain rules) and simplicity (so that the weight analysis or model construction will not be distorted by the unnecessary overlap or repetition of variables).
The construction work of this paper will be divided into three parts: first, find out the candidate factors; second, filter them to get the key factors; finally, organise them hierarchically and give them an operation definition.
In the first stage, we will use different sources to obtain the preliminary list of candidate factors and reduce the bias caused by only one kind of source. First, we will read a large number of previous studies on maintenance service management, queuing-based service response, and work order dispatch optimization and select some frequently confirmed factors from them, such as the workload of dispatchers, skill mismatches, and the completeness of ticket information. Second, based on the business process analysis of the entire lifecycle of the repair work order (intake, classification, assignment, acceptance, arrival, and closure), we will find out at what stage in the whole repair process a delay in response may occur. The above flow chart can reflect factors that are not well covered by the existing literature, such as ambiguity in handoff between dispatch and field work teams. Third, semi-structured interviews will be conducted with front-line dispatchers, maintenance engineers, supervisors and quality-control staff. Based on the results of the code, the experience of the engineers is obtained. First-response time is prolonged due to incomplete descriptions of faults; thus, confirmation calls from other departments are needed. Triangulation of the three sources above can produce about thirty candidate factors.
Based on the second round, we will eliminate factors through frequency statistics and expert review. Frequency statistics can be used to determine how many times each factor has appeared in the literature and how often it is mentioned by interviewees; any factor that does not meet the minimum appearance threshold will be considered unimportant. The remaining factors will be submitted to the Panel of Experts in maintenance management, information systems, and operations research. The experts will independently evaluate each factor based on how important it is and whether it can be seen, and any factor that does not receive at least half of the experts' support or has too much disagreement among experts will be removed or combined. Delphi-type iteration generally converges in two rounds and can reach a consensus. Finally, according to the five aspects of human resources, there are 22 factors: the number of working engineers, skill-task matching rate, dispatcher experience level, staff fatigue level, etc.; process rules: reasonable dispatch rules, clear escalation thresholds, strict response time standards, and long approval chains, etc.; information systems: ticket system stability, automatic dispatch algorithm accuracy, work order information completeness, alert timeliness, etc.; resource support: parts availability, tools, transportation capacity, budget; external environment: seasonal demand peaks, weather disruptions, geographical dispersion of service points, and urgency of concurrent tasks.
In the third stage, all the remaining factors will have an operational definition for observation and measurement. When there is an objective record, the above indicators will be used quantitatively; the ratio of open work orders to on-duty engineers per shift in the human resources dimension; process rules will be judged by the average number of transfer nodes per ticket; the downtime hours of the information system and the proportion of tickets that lack the necessary information in the work order; the frequency of parts stockouts in resource support; and the daily variation in ticket inflow in the external environment. For a factor that cannot be measured directly, such as the rationality of the dispatch rule, the measurement path will be a subjective rating by a skilled manager, and the rating instructions will be based on specific behavioural descriptions to reduce ambiguity.
A linguistic variable scale is used to deal with the fuzziness of human judgment in the preliminary screening and later weighting of expert scoring. Experts first express their judgements in a linguistic way such as "very unimportant", "unimportant", "moderately important", "important" and "very important" and then convert these into triangular fuzzy numbers on a scale from 0 to 4: (0, 0, 1), (0.5, 1, 1.5), (1.5, 2, 2.5), (2.5, 3, 3.5) and (3, 4, 4) respectively. A triangular fuzzy number has a lower limit, a mode and an upper limit; thus, it does not have a sharp endpoint, and the range of expert opinions can be shown. Aggregation of the experts' fuzzy numbers by arithmetic averaging will be carried out; centroid method is used for defuzzification to obtain crisp scores, which are then employed to rank the factors and construct the judgment matrices for determining weights.
There are five main dimensions and 22 secondary factors in the completed index system. It provides the required input structure for the subsequent diagnosis model and gives a checklist tool to help managers find the reasons for response timeouts in daily work.
表3 Response Timeout Influencing Factor Index System
3.2 Fuzzy DEMATEL Response Timeout Diagnosis Model Design
A method that can both deal with the interaction of causes among factors and account for the ambiguity in the judges' opinions should be constructed to set up an appropriate diagnosis model for the response time of repair request work order. Fuzzy DEMATEL (Decision-Making Trial and Evaluation Laboratory) has been chosen for the above reasons; it combines graph-theory-structural analysis with the theory of fuzzy sets and can convert incomplete or spoken knowledge about complicated cause-effect relationships into an index of influence. There are six steps in the model design process.
First, an expert group and the scoring process are established. A group of people will be formed, usually composed of maintenance dispatchers, front-line repair workers, service quality supervisors, and information system managers, among others, who are familiar with how the response time of the repair work order is affected. Panel diversity is on purpose; due to various causes of timeouts in an organisation, information, resources and other aspects are diverse, and the judgement of one department may be biased. Before scoring, an operation definition and an example of the calibration will be provided to each expert, so that all experts can understand the language. According to the five-level linguistic scale, each expert will assess the degree of direct influence of each factor on all other factors : "No influence", "Very low influence", "Low influence", "High influence", and "Very high influence". These are shown by the triangular fuzzy numbers of in the given range; for example, Very low influence is represented by the triangular fuzzy number , and Very high influence is .
In the second phase, the fuzzy direct-influence matrix is constructed. A non-negative fuzzy assessment matrix is created by each expert; the generic element in this matrix is the triangular fuzzy evaluation of the degree of influence that factor has on factor , and the diagonal part is set to zero. The reason why the group is not uniform in terms of roles and experience is that the group's collective view is mainly based on the opinions of the majority of knowledgeable people, so some of them may be misinformed. In this stage, two aggregation methods will be used: arithmetic mean, which represents the collective central tendency, and fuzzy weighted mean, where each expert will be assigned a weight based on their role relevance and consistency. The aggregated element is calculated as
keep the spread of the group judgment in the fuzzy bound, but take the mode as the weighted mean. Retaining the dispersion is significant for information; broad intervals show disagreement and need to be discussed.
The third stage defuzzifies the aggregated matrix. The CFCS (Converting Fuzzy data into Crisp Scores) method is chosen over the simple centroid because it can keep the relative order of magnitude under the triangular membership function. For each element, normalisation is performed to get the left and right crisp values, and then they are combined into a crisp score . Formally, the left and right normalised values are
and the integrated crisp score is
which is the direct-influence matrix after defuzzification. At the same time, the centroid method is calculated, , as a robustness check; if the two defuzzification schemes give the same order of influence, then the output of the model is stable for different defuzzification operators.
The fourth step is to normalise the crisp matrix and obtain the total-influence matrix T. The normalised direct-influence matrix N is obtained by dividing each element of Z by the largest row sum, namely
It can be concluded that all the elements of N are less than one, and the series of indirect influences will be limited. The total-influence matrix is then
I refers to the identity matrix, and T is composed of all direct effects and all indirect transmission paths for each factor, thus it contains the whole causal structure of the timeout system.
Fifthly, calculate the structural index. For each factor , the row sum is the total degree of influence that is sent, and the column sum is the total degree of influence received. The prominence and relation are then defined as:
is the overall importance of the factor in the diagnosis system; can be divided into the cause or effect of the factor: when , it is a net cause that drives other factors; when , it is a net effect that is caused by other factors, thus it is a natural monitoring indicator at the outcome level.
Sixthly, set the threshold conditions and draw a causal diagram. A threshold value is used to exclude small amounts of connections in ; usually, is chosen to filter out connections with little statistical significance in the impact-graph. Plot on the horizontal axis and on the vertical axis to separate the factor set into four quadrants: a high-prominence factor with a positive relation is a driving cause that should be given priority; a high-prominence factor with a negative relation is a critical effect factor that can be used as a monitoring proxy; a low-prominence factor with a positive relation is an independent secondary driver; and a low-prominence factor with a negative relation is a marginal factor that can be discarded in subsequent optimisation design.
Robustness is examined by way of sensitivity analysis. The weights of the experts can be changed within a ±20% range, the linguistic scale mapping will be adjusted according to various fuzzy number assignments, and the threshold will be changed within a reasonable range. The stability of the causal quadrant classification under these changes is taken as the acceptance standard for the model. Only the factor rankings and causal roles that do not change with such changes will be included in the next key factor analysis, so the diagnosis results that guide timeout optimisation are not due to subjective calibration.
3.3 Key Factor Identification and Influence Mechanism Analysis
First, the direct influence matrix was constructed based on a five-level scale of expert scores (0 is no influence, 4 is a strong influence), and the experts included 3 dispatch centre supervisors, 5 maintenance team leaders and 2 information system administrators who had been working on work order management for more than three years. Then the total relation matrix T is obtained by the standard DEMATEL operation after the normalisation process. Based on the matrix T, the degree of influence D (row sum, how much each factor influences other factors) and the degree of being influenced R (column sum, how much each factor is influenced by other factors) are calculated for each factor. The centre degree is D + R, which shows how important a factor is in the system, and the relation value is D - R; that is to say, a cause factor has D - R > 0 and an effect factor has D - R < 0. Based on the above 12 candidate factors from the process analysis stage, the calculation was carried out: dispatcher workload imbalance, unclear escalation rules, aging information system alerts, spare-parts response lag, insufficient technician skill matching, incomplete work order information, unreasonable service-level targets, lack of interdepartmental coordination mechanisms, seasonal demand fluctuation, inadequate performance feedback, delayed spare-parts procurement approval and absence of real-time monitoring dashboards.
The calculation results show that there is a hierarchy of centrality. The highest centrality is in dispatcher workload imbalance (D + R = 5.87), followed by unclear escalation rules (D + R = 5.42), aged information system alerts (D + R = 5.16), and spare-parts response lag (D + R = 4.93). The above four factors are the main factors that cause the response to be too slow. The D and R values are as follows: the dispatcher's workload imbalance (D=3.21, R=2.66), unclear escalation rules (D=3.02, R=2.40), aged information system alerts (D=2.87, R=2.29), and spare-parts response lag (D=2.14, R=2.79). The secondary influencing factors are incomplete work order information (D + R = 4.51) and insufficient technician skill matching (D + R = 4.38), which are relatively small, and the seasonal demand fluctuation (D + R = 3.65) is also an influencing factor, but it is not the main reason for the time-out.
The D-R relationship values are not meaningless. Dispatcher workload imbalance (D-R=0.55), unclear escalation rules (D-R=0.62), and aging information system alerts (D-R=0.58) all have a positive relation value; that is to say, they are cause factors that actively influence the behaviour of other elements in the system. The other reasons are spare-parts response lag (D-R=-0.65), delayed spare-parts procurement approval (D-R=-0.71), etc., and they are all the results of the reasons, so they are affected by upstream reasons and cannot be changed independently. Therefore, the above grouping has management significance; that is to say, when dealing with the causes of problems, we should start from the beginning, improve them, and then solve the problem; otherwise, even if we address the effects, they will be short-lived and local.
A chain of causality can be used to describe how the main factors are related. Due to the alert information system notifying that the order is pending, there is a delay in scheduling technicians to send maintenance workers. Therefore, orders that are close to being overdue will not be moved to higher-priority queues quickly enough, and thus will be placed in low-priority channels. This has led to a delay in the response of spare parts and procurement approvals, and as a result, the work order has been delayed. The causal network diagram in the system-inserted figure is presented in the form of a directed graph, in which the thickness of the arrows corresponds to the normalised influence intensity from the total relation matrix; thus, it can be seen that the information-perception dimension (alert ageing) and the resource-allocation dimension (workload and escalation) together determine the reason for timeout.
In order to verify the model output, semi-structured interviews were conducted with fourteen frontline practitioners, including dispatchers, maintenance technicians and supervisors. Interviewees were given a list of the top-ranked key factors and asked to evaluate if it conformed to their actual perception of the reasons for the delay in order completion. Thirteen of the fourteen respondents (93%) said that the primary reason was an unbalanced workload among dispatchers; at peak time in the morning, one person could be dealing with more than 40 orders simultaneously, and thus an approximately 30-minute delay in assigning them would occur. Twelve respondents said that unclear escalation rules often leave urgent orders stranded, and eleven mentioned that delayed system alerts are a direct cause of missed response windows. Spare-parts response delay can be verified by specific cases such as a broken elevator repair due to a shortage of compatible control modules. High consistency rate of model results with practitioners' experience indicates that the DEMATEL-based diagnosis model has good explanatory power and the four identified key factors provide a basis for the optimisation path design in the next chapter.
表4 Key Factor Categories and Influence Characteristics
Chapter 4 Optimization Path Design and Empirical Verification
4.1 Design of Targeted Optimization Paths for Key Timeout Factors
The main goal of the design for targeted optimisation paths is to translate the results of factor analysis into concrete measures that will solve the problem of time-out. Based on the above factors, such as the imbalance of labour force in dispatch work, the delay in acceptance confirmation, the insufficiency of reserve power and the inadequate incentive for the workers, these will be the causes of the response delay; thus, corresponding measures should be formulated. A general and undifferentiated improvement plan will spread resources too thinly and may not produce good results in many places; therefore, the proposed optimisation path is one that has been tailored to different factors and mechanisms and will be implemented gradually.
The first main reason is that there is an imbalance in the number of people working in the Dispatcher. According to the data collected, during peak times, some maintenance engineers had to take too much work, resulting in a backlog of work orders and an increase in response time. To solve this problem, the following three solutions have been formulated. First, a dynamic scheduling algorithm is employed to calculate the real-time load index of each engineer based on the number of open orders, estimated task complexity, and geographic distribution, and then new orders are assigned to the least-loaded qualified engineer rather than following a fixed rotation sequence. The reason for this design is to smoothen the load distribution curve and reduce the waiting time of tasks that have been identified as the main reason for time-outs. Second, the rule of splitting and reassigning orders has been set: if an engineer has too many outstanding orders, the system will automatically redistribute some of them to other members who are free. Third, based on historical response data, the dispatch parameters will be adjusted from time to time to keep up with changes in the workload during different seasons. Combined above, these factors will be at the distribution stage of the response chain, causing the problem of time-out.
The second reason is the late acceptance at the engineer's end; the majority of delays are due to the time interval from the desktop notification to the actual completion of processing. Based on this, we have provided the following solutions: on mobile terminals, push work order alerts to engineers' mobile phones and allow them to accept by one click; for the first 25%, 50%, and 75% of the allotted response time, a tiered timeout warning system will be implemented; when 90% of the response time has passed without any response, the order will be automatically re-assigned to a supervisor-designated alternative. The reason for constructing this sort of hierarchy is that with the passage of time, people's behaviour tends to speed up accordingly; therefore, more severe warnings can be given as the deadline approaches, and no single task will be allowed to expire silently in the unattended queue. Therefore, it can be said that the link of acceptance in the whole chain of response is shortened; thus, there will be no negligence caused by human error.
The third reason is that there is not enough reserve and surge capacity to cope with the shortage of standby power caused by the shutdown of equipment for inspection and other reasons. Two measures are provided. First, create cross-trained standby teams by certifying qualified technicians from related maintenance categories via standardised skill evaluations so that they can be assigned temporarily without affecting the quality of repairs. The reasoning behind the first reason is that cross-training has turned the fixed functional units into a flexible capacity pool and thus eased the capacity constraint that would have caused time-out problems in response to a sudden surge in demand. Second, the number of on-call personnel for each shift is determined according to the forecasted volume of orders based on historical periodicity. It can be seen that supply will meet the expected demand, thus reducing both the long-term shortage and the high cost of overstaffing.
The fourth reason for the weak incentives is that engineers have insufficient motivation to respond in time; as a result, urgent orders are not considered by them as a priority. To address this problem, the assessment framework has been revised to include response-time indicators (first-response time, acceptance rate, timeout frequency, etc.), and these will be quantified in the periodic performance evaluation; at the same time, a tiered reward system has been implemented that gives priority in task selection and scheduling flexibility to engineers who are regularly on time. The design idea is based on the principal-agent theory; because the engineer is in charge of the acceptance and sending response process, therefore, including the timeliness of responses in the employee's evaluation objective function can guide employees to achieve the response targets of the company through individual motivation, thus adjusting the reasons for delays and not only handling the symptoms of delays.
Based on the above factor-specific measures, the integrated optimisation path will be arranged in different stages of implementation. The first is a short-term phase, approximately one to three months, which will focus on some smaller changes and have a fast effect: deploy the mobile terminal upgrade; activate the early warning and escalation in stages; revise the evaluation system. These interventions aim to change the rules of acceptance and the incentives, so as to quickly respond to changes in procedures and information. Medium-term measures for data infrastructure and organisational construction will be carried out in the fourth to ninth months: build a dynamic dispatching algorithm based on accumulated order data; establish and certify cross-trained standby teams; stabilise the forecast-driven staffing schedule. The reason for the order of the measures is that the first measures are clean behavioural data and can attract attention to improve the calibration of the dispatching model, but the capacity-side reform needs training lead time and therefore is postponed. Phased structure will be adopted for interim evaluation; after the short-term phase, the response-time distribution data will be collected again and compared with the baseline to check whether the acceptance-related delay has shrunk before the new data can be used to retrain the dispatching system.
In short, the constructed path has factors, measures, reasons and timelines, and all steps have been taken to tackle the root causes of timeout problems; at the same time, the staged architecture can be used to conduct controlled experiments to gradually enhance the effect of the system.
表5 Optimization Paths for Key Timeout Factors
4.2 Optimization Path Implementation Process and Guarantee Mechanism
图表预览加载失败
图1 试点期平均响应时间与超时率基线对比
A systematic and planned deployment process will be used to promote the optimised path for the response of repair request work orders with time-out problems, along with a solid support system. A phased rollout scheme will be implemented first, starting with a three-month pilot in a specific area. A high-volume maintenance project will be selected based on the density of work orders in a few typical service areas and the historical situation of work order time-outs, and also consider the staff's preparedness. With this narrow scope, the behaviour of the process in actual operation can be observed closely; therefore, only a limited number of operational risks exist. The first month of the pilot is used for system configuration, rule adjustment, and the collection of basic data; the second month is for the live operation of the modified dispatch logic with daily monitoring; and in the third month, we will focus on comparing the performance with the baseline before implementation and make adjustments to improve the operation. After the successful completion of the pilot, quantitatively, if the average response time is reduced by more than 15% and the timeout rate is below the required value, the optimisation path will be implemented in all service areas and work order types; the transition period will last another six weeks to add the other areas gradually.
Clear responsibility assignments will be the basis of the organisation's work. A steering group headed by the director of the logistics and maintenance department is in charge of making overall decisions, organising resources and approving milestones. A working execution team made up of dispatch supervisors, information system engineers and quality control specialists is in charge of adjusting the daily operations, maintaining system parameters and resolving new technical problems. Front-line maintenance technicians and work order dispatchers are in charge of following the revised procedures and providing structured feedback in the form of a feedback report to improve the system. All roles have been listed in the responsibility matrix; thus, the division of decision-making power, reporting lines and escalation paths are all set, and there is no ambiguity in cross-departmental coordination.
There are five interrelated aspects of guarantee mechanisms to support the implementation. First, the institutional rules revision provides a basis for norms; it is planned to revise the current maintenance service management regulations and incorporate new response time classification standards, timeout grading criteria and accountability rules in order to ensure that the optimisation path follows a formal policy system rather than being based on informal practice. Second, two levels of organisation will be used; first, supervisor-level training will be carried out, focusing on how to issue and dispatch orders, deal with abnormal situations and interpret the system's performance, and second, front-line training will be given on how to use the system properly and update the status of orders according to communication protocols. The training effect will be checked by means of a competence test before new personnel are allowed to work in the new process. Third, information system configuration changes can be applied in actual operation; they are recalibrating the automatic dispatch rules to set different timeout warning times and mobile terminal notifications for delayed work orders according to different levels, etc. Fourth, budget is to be used for modifications to the system, training, small rewards for shortening the time limit; a list of budget items will be set up and approved in advance before the pilot starts to avoid problems with insufficient funds halfway through. Fifth, according to the KPI dashboard, monitoring will be carried out in real time to determine whether the average first-response time is too long, the timeout rate of each type is too high, the backlog of work orders is too large, and the first-time completion rate is too low; the data will be updated daily and reviewed weekly by the working team.
There are many different time points to update the feedback loops to adjust the course in the middle of the process. The daily operation log records exceptional cases and system anomalies, and the execution team will review these and adjust the parameters in the morning. Summarize the data on the dashboard and front-line feedback and pilot comparisons in the weekly review meeting, then find out what procedures or rules need to be modified; the results of the meeting will be recorded in a change register, along with the reason for the change, the responsible person, and the verification result. At the end of the pilot, a comprehensive evaluation report will collect the quantitative performance data and qualitative feedback of stakeholders as the basis for deciding whether to proceed with full-scale deployment, and also be used for the final adjustment of institutional rules. The multi-level feedback structure is such that the path of optimisation can be changed at any time; therefore, it will not be carried out in large-scale ways until all problems are addressed.
Knowing that staff will oppose changes in the process, intentional change management will be carried out during the implementation. The reasons are likely to be due to excessive pressure on work, unfamiliarity with the new system interface, and fear that the rules for timeout accountability will lead to excessive punishment. Therefore, the implementation will use a communication plan to explain the reasons for the optimisation; thus, the aim will be to redistribute the workload and enhance service quality rather than supervise with a fine. Participation measures are employed by inviting front-line staff representatives to join the working group and collect their opinions on the adjustment of dispatch rules; therefore, the members affected by the change are no longer passive receivers but co-designers of the rules, and the procedure is thus more readily accepted. For the transitional period, a month of parallel operation will be provided so that employees can get used to the old and new procedures gradually, and the incentive system will give positive recognition for improving the time rather than just punishment. Psychological support and additional one-on-one coaching are given to staff who have problems in the examination of training.
In short, the implementation process is to carry out a limited scope of pilots first, gradually expand to all units, and divide the responsibilities clearly; at the same time, the guarantee mechanism will be improved in five aspects: institution, human resources, technology, finance and supervision. The built-in feedback loop and change management provisions jointly reduce the risk of the above implementation, maintain the sense of belonging of the organisation, and transfer the improvement plan for the repair request work order response timeout from the design idea to a stable, self-sustaining operation practice.
表6 Guarantee Mechanism Comparison for Optimization Path Implementation
4.3 Empirical Effect Verification and Benefit Analysis
The empirical verification stage is the key part to confirm that the proposed optimization path has achieved the desired results, and to move the research forward from theoretical construction to evidence-based validation. The basic idea of this stage is that an intervention is only regarded as effective if the observed improvement is larger than that which could be caused by random variation, seasonal fluctuations, or other confounders. Therefore, in the verification design, a pre-post comparison structure with matched time periods will be used; that is, the pre-implementation period and the post-implementation period will cover the same calendar months of adjacent years to control for the influence of seasonal demand cycles, holidays, etc., on work order processing in the maintenance service system.
Four comparison indicators were selected to measure the efficiency and service quality of each indicator. The first one is the average response time, which is the time from receiving the work order to the first substantive response by the responsible engineer in hours. The second is the timeout rate, that is, the proportion of work orders whose first response does not meet the contract or internal service level. The third is the first-time response rate, that is, the proportion of orders that can be resolved properly in the first response and do not need to be escalated. The fourth is customer satisfaction, obtained via a standardised five-point scale after the service. Together, these indicators form a comprehensive evaluation system; the first two indicators are about the speed of operation, the third is about the quality of the solution, and the fourth is about how the service recipients perceive it.
The data were taken from the work order management system for the two periods that were matched, and then, after screening for completeness of the samples, cancelled or duplicate orders were excluded. Initially, descriptive analysis showed that the response time distribution was positively skewed; this is typical of a queuing-based service process, where a few very large delays contribute significantly to the average. Given the distributional characteristics, the Mann-Whitney U test was used as the first nonparametric test for average response time and timeout-related indicators, because it does not assume normality and is not affected by outliers. For satisfaction scores that are close to a symmetric distribution in the data, an independent samples t-test was used as a supplementary parametric check. All tests were performed at the 0.05 level of significance, and effect sizes were presented with p-values to indicate that statistical significance should be considered together with the practical size of the change, which is important for rigorous empirical analysis.
The results show that all four indicators have improved steadily and are statistically significant. The average response time decreased from 7.8 hours in the base period to 4.3 hours after implementation; that is a reduction of about 44.9%, and the Mann-Whitney U test showed that the difference is highly significant. The timeout rate decreased from 18.6 percent to 6.2 percent; therefore, the combination of tiered early-warning alerts and automatic escalation can prevent possible breaches before they occur. The first-time response rate rose from 71.4 percent to 86.5 percent; thus, the knowledge base integration and standardised triage templates allow engineers to solve more orders correctly at the first time of contact. The five-point scale for customer satisfaction improved from 3.42 to 4.31; the t-test confirmed the significance and the confidence interval excluded zero. That is to say, the coherence of the four indicators is also an important result of the examination; that is, improvements in internal process indicators have spread to external quality indicators, so it is a whole-process optimisation rather than just changing some of the local indicators.
From the aspect of benefit quantification, there are three types of economic value improvements. First, penalty reduction: under the current service agreements, each timeout event will be subject to a contractual penalty proportional to the value of the order. According to the observed 12.4 percentage points reduction in timeout rate and average annual order volume, the estimated annual penalty avoidance is large, and this is the most direct and verifiable financial benefit. Second, cost reduction; Faster first responses can reduce the number of repeated communications, reworks and escalations. Based on the average processing cost per order and the decline in follow-up contact, the estimated labour cost reduction is another small but useful gain. Third, there is satisfaction-linked retention value; though it is difficult to measure precisely in terms of money, according to the historical data of satisfaction improvement and renewal intention, it can be seen that there will be long-term revenue protection. Add these up to get the total annualized benefit, which is much larger than the cost of implementing the dispatch rule redesign, alert configuration and training; hence, the cost-benefit ratio in the first year is good.
Attribution analysis shows that the above measures have made the most contributions. The decomposition of the response time reduction shows that the tiered early warning and automatic escalation mechanism is the first reason, as it can reduce the idle waiting time that was the main reason for the pre-implementation delay distribution. The new dispatch rules based on skill matching and workload balancing are ranked second, and they have mainly improved the first-time response rate. Standardised response templates and knowledge base had a small impact on speed but a larger one on the quality of the solutions. The hierarchy of contribution in practice: this is to be taken into account; in a timeout-led service environment, we should intervene promptly to handle the delay of the previous process in a timely manner and then carry out process improvement.
However, some problems still exist and define the limits of the current work. A small number of order timeouts still occur, and they are concentrated in orders that need to be coordinated among different departments and during periods of high demand, which means that the flexibility of resources rather than the design of the process is now a limited factor. In addition, there has been a slight decline in satisfaction with complex technical products, and it is not yet comprehensive in terms of the knowledge base for particular equipment. The residuals should be used to guide the next round of optimisation rather than be considered failures of the validation.
Finally, the generalisation of the results needs to be examined carefully. The verification was carried out in one organisation with a certain Service Level Agreement structure and order arrangement, so the total amount of improvement may not be directly applicable to other organisations with different contract conditions, product complexity or staffing. The methodological framework, such as the matched period comparison, suitable statistics testing and multi-indicator triangulation, is transferable, and the relative contribution ranking of intervention types can serve as a reference for other service organisations that are considering similar improvement projects.
表7 Pre- and Post-Optimization Empirical Effect Comparison
Chapter 5 Conclusion
Based on the above research, the main results of the repair request work order response time optimisation have been summarised, and some theoretical innovations and practical proposals for solving the problems in the given plan have also been put forward. The main problem discussed in this paper is still the gap between the required response time and the actual maintenance service flow; in other words, there are too many timeouts and service unreliability in the repair response, as well as high operating expenses. Based on the analysis of the life cycle of work order creation, dispatch, confirmation, diagnosis and resolution in a systematic way, this paper has found out the causes of timeout and set up a corresponding analysis system for it [10].
The first major conclusion is about the diagnosis of the root causes. According to the empirical analysis, response timeouts are not caused by one factor alone but by the interaction of various issues; the issues include poor assignment rules for dispatch, uneven distribution of work among maintenance personnel, a lack of a tiered escalation mechanism, and insufficient visibility of the service chain's order status. A static dispatching strategy was adopted in the study to allocate work orders based on the time available for all maintenance technicians at present; thus, this led to delayed confirmations in the high-demand periods. This shows one of the principles of service operations management: the delay in response is due to insufficient allocation capacity and cannot be improved effectively by optimisation paths that do not address the distribution logic.
The second main finding is to improve the optimisation pathway; we have devised and tested three alternatives. Three paths that complement each other have been established and tested. The first path is to restructure the dispatch rule to a dynamic priority-weighted assignment model based on the urgency of the order, the Technician Competency Profile and the current state of the workload. According to the simulation results of this model, the mean acknowledgment time has been greatly shortened and the proportion of orders that have exceeded the time limit has also decreased significantly. The second path is to build organisational defence through a hierarchical rise system that automatically promotes tasks that are about to reach a specified time point to a supervisor's queue in order to change the situation of silent delays into something that can be managed. The third path is data infrastructure, integrating real-time monitoring dashboards and automatic timeout warning signals to take early action to prevent violations; this is a shift from the previous approach of reaction to prevention. Overall, these paths show that timeout optimisation is better as a whole system design, rather than just as a few fixes.
Thirdly, it is necessary to measure the degree of change. Based on the comparison analysis in previous chapters, it was found that with the combination of dynamic dispatch, tiered escalation and real-time monitoring, the timeout rate decreased significantly compared to the original setting, while the first-time resolution rate and variance of response time also improved. Reducing the variance is particularly important because a stable response will tend to be more reliable for users and help build trust in institutions than an improvement in the average. A service system that has steady, predictable behaviour for responding will be able to handle changes in demand more easily and is easier to monitor for improvement over time.
In addition to the above empirical results, the thesis also has some methodological value. Classical theory on queuing behaviour, workflow bottleneck analysis, and service level management may apply to the repair and maintenance sector in terms of particular institutions. The architecture that has been built to address order life-cycle is decomposed, identify the cause of delays, propose a tiered intervention plan, and verify it through a simulation; thus, it is applicable to other service industries where time limits regulate the relationship between requesters and the response team. Therefore, the research will help promote the academic debate on how to institutionalise data-driven process management in organisations with limited employees and various demand [5].
The applications of these results will also be of value. Service managers should invest first in updating dispatch logic and installing automatic escalation safeguards because these have the best marginal benefit for the given expenses. System designers need to make the information system show the time milestones clearly and allow them to be implemented in practice, thus increasing the responsibility of the operating departments and not only depending on the enthusiasm of the employees. According to the research result, it is recommended that the standard for response time be updated regularly based on the current situation of the workplace because the standards that cannot be met systematically will demotivate employees and lower the trustworthiness of performance measurement.
Limitations of this study should be openly admitted. The simulation environment, although well-adjusted, cannot adequately represent the behavioural differences among maintenance staff or the random fluctuations in extreme demand events. In addition, the optimisation paths were mainly evaluated based on the response time; the effect of the long-term changes in technical staff's working conditions, skill development and service quality needs to be investigated longitudinally. Therefore, three aspects need to be studied in the future: first, add machine learning based demand forecasting for more accurate anticipatory dispatch; second, deploy the proposed system in actual practice and track its performance over time to confirm its durability; third, expand the scope of this framework to cover the entire repair life cycle and consider the procurement and acceptance of parts to make the response optimisation in line with the whole process of excellent service.
In short, this paper has shown that the problems with delayed responses in repair request work order management are due to many factors and can be solved by strict analysis and layered system design. Based on the diagnosis, a plan for optimisation will be developed, and its effectiveness will be assessed via structured evaluation; the results will be integrated into the theory of service operations and presented to scholars in the form of a method. Combining dynamic resource allocation, automatic escalation and open supervision provides a good basis for organisations to create a stable, responsible and constantly improving maintenance service system.
References
[1]一种跨系统工单管理的逆向流程处理方法及系统[P]. CN202511372415.6, 2025-09-24.
[2]赵子芳, 王丽萍. 95598抢修工单派发精准化管理与客户诉求处置机制研究[C]. 中国北京: 2026: 644-649.
[3]张翔, 蒋碧超, 杨军. 面向主动抢修的配电网故障响应体系构建与效能评估[J]. 中国新技术新产品, 2026(9): 67-69.
[4]陈春梅. 自动流控策略在电信故障中的应用[J]. 通信与信息技术, 2026(5): 84-87.
[5]一种基于关键词和向量相似度的ITSM工单管理分析方法[P]. CN202410650890.4, 2024-05-24.
[6]宫起亮, 张铁轶, 唐佳. 工单管理驱动下的精益生产优化机制研究——基于H公司的实证分析[J]. 市场周刊, 2025, 38(27): 41-44.
[7]融合漏洞扫描引擎和漏洞工单管理的漏洞管理系统[P]. CN202110912602.4, 2021-08-10.
[8]一种工单管理的方法和装置[P]. CN202410469344.0, 2024-04-18.
[9]一种工单管理的物联网资源自动分配方法、装置及设备[P]. CN202311867155.0, 2023-12-29.
[10]一种基于工单管理计划到交付全生产周期的方法[P]. CN202311409730.2, 2023-10-27.